Factory Overview
Production Management Office
Quick Turnaround
If you have work that you want to progress during long holidays, please leave it to us.
Production and shipping during holidays → In your hands after the holidays
In the case of air transport, the product will arrive in Japan the day after
factory shipment, and delivery to the customer can be completed in as
little as 3 days after factory shipment.
Quick Turnaround
If you have work that you want to progress during long holidays, please leave it to us.
Production and shipping during holidays → In your hands after the holidays
In the case of air transport, the product will arrive in Japan the day after factory shipment, and delivery to the customer can be completed in as little as 3 days after factory shipment.
Material Cutting Booth
Welding Booth
Assembly Booth
Inspection Booth
Procurement of various materials
Compatible with a variety of materials
Material cutting
Drilling
Lathe and machining
Assembly and welding
Primary inspection (appearance and dimensions)
Superiors' Inspection
Various surface treatments
Secondary Inspection
Custom labels for client system
Packaging and shipping
φ400 2 units
TIG welding machines: 7unit
Semi-automatic welding machine 500A 1 unit
Semi-automatic welding machine 300A 1 unit
Magnetic drilling machine: 5 units
Drill press
Drill press: 2 units
CNC milling machine (400x750)
CNC lathe
Radial Drilling Machine
Brake press (T3.5x2,000L)
Shearing (T4.5x2,000L)